College of Staten Island

The College of Staten Island’s main gymnasium floor suffered mold damage from leaks and problems with exterior drainage.  Klepp was asked to repair over 18,000 ft2 of maple athletic flooring.  Klepp’s experience was critical to the repair plans, the installation and the project schedule.  Prior to starting the project, Klepp researched the problems with a general contractor.  Recommendations ranged from improved door seals to re-grading the building exterior to prevent recurrence of problems.  Once the water problems were corrected and the mold remediated, Klepp Wood Flooring repaired the floor.  Klepp managed to preserve over one-third of the existing surface to minimize the cost of the repair.  The project was completed according to the most stringent of schedules that allowed the school to complete a sports season in the winter on the old floor and graduate a class in May on the new surface.


home | about | contacts | gallery | partners | search

Copyright ©2001-2005 Antic Moon Internet Company.  All Rights Reserved
Please report errors and missing links to the vinny@anticmoon.com